Corporate Social Responsibility management model for the optimization of operation and maintenance in small hydroelectric plants 0 0
DOI:
https://doi.org/10.51896/n8bv5379Keywords:
Corporate Social Responsibility, Hydroelectric Power Plant, Operation and Maintenance, ODS, CubaAbstract
The objective of this article is to propose an integrated Corporate Social Responsibility (CSR) management model applied to the operation and maintenance (O&M) of small hydroelectric plants (PCHE), through the development of an automatic ventilation controller that mitigates the impact of polluting gases and climatic variables. The central problem is that the Mayarí PCHE faces technical challenges due to tropical environmental conditions and gases (SO₂ and NO) that compromise the automatic infrastructure and operational sustainability. The methodology employed uses a mixed-method approach: gas monitoring with the GASBOARD-3800P analyzer; thermodynamic and geometric modeling in ANSYS Fluent and SolidWorks; management under agile Scrum methodology and application of international regulations (ANSI/ISA, IEC). The results identified high concentrations of SO₂ (140-180 ppm) and a positive correlation (0.94) between temperature and contaminants, in addition to condensation due to humidity greater than 80%. As a solution, the conceptual, basic and detailed engineering of a controller for forced ventilation with verifiable indicators was designed. The partial conclusions indicate that the integration of CSR in O&M requires predictive models adapted to local contexts to ensure compliance with SDGs 7, 9, 11 and 13. The experience in Mayarí is established as a methodological reference for the validation of impact coefficients in contexts with greater data density, thus guaranteeing the profitability and leverage of international funds.
Downloads
References
ANSI/ISA-71.04-2013. Environmental Conditions for Process Measurement and Control Systems: Airborne Contaminants. USA.
Arbella Feliciano, Y., Sierra Pérez, R. J., & Ruiz Cabeza, R. (2025). Modelación matemática del comportamiento termodinámico en la PCHE Mayarí. SIMPOSIO 8, Convención Científica Internacional 2025, Universidad de Holguín.
Arbella-Feliciano, Y., Trinchet-Varela, C. A., Lorente-Leyva, L. L., & Peluffo-Ordóñez, D. H. (2023). Condition Monitoring of Wind Turbines: A Case Study of the Gibara II Wind Farm. Journal Européen des Systèmes Automatisés, 56(2).
CEI/IEC 654-4:1987. Operating conditions for industrial-process measurement and control equipment (part 4).
Geocuba. (2018, 2020). Informes técnicos: Monitoreo de condiciones ambientales en PCHE Mayarí. Empresa Geocuba, Holguín.
Feliciano, Y. A., Trinchet, C. A., & Meléndez, E. (2020). Analysis of the thermal behavior in the Goldwind S50/750 Wind Turbines installed in the Wind Farm Gibara II using CAD-CAE Tools.
NC 872:2011. Seguridad y Salud del Trabajo. Sustancias nocivas en el aire de la zona de trabajo. Evaluación de la exposición laboral. Requisitos generales. Oficina Nacional de Normalización, Cuba.
NC TS 803:2010. Calidad del aire - Emisiones máximas admisibles de contaminantes a la atmósfera en fuentes fijas puntuales de instalaciones generadoras de electricidad. Oficina Nacional de Normalización, Cuba.
Pérez Rodríguez, R., Ruiz Cabeza, R., & Salazar Pérez, L. (2025). Simulación numérica del comportamiento de la humedad relativa en la PCHE Mayarí. SIMPOSIO 8, Convención Científica Internacional 2025, Universidad de Holguín.
Salazar Pérez, L., Pérez Rodríguez, R., & Arbella Feliciano, Y. (2025). Gestión del proyecto diseño de autómata para la PCHE Mayarí. SIMPOSIO 8, Convención Científica Internacional 2025, Universidad de Holguín.
Saraiba-Núñez, L. I., Arbella-Feliciano, Y., Moreno-Pino, M. R., & Torres-Sainz, R. (2023). La gestión del mantenimiento acorde a la criticidad de los activos. Ciencias Holguín, 29(2).
Sierra Pérez, R. J., Ruiz Cabeza, R., & Arbella Feliciano, Y. (2025). Modelación geométrica de las zonas técnicas en la PCHE Mayarí. SIMPOSIO 8, Convención Científica Internacional 2025, Universidad de Holguín.
Universidad de Holguín. (2021). Estudios y propuestas para la mejora de condiciones operativas en PCHE Mayarí. Informe de investigación. Centro de Estudios CAD/CAM, UHo.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.