[1]
J. M. Pérez Esquivel, M. A. Mendoza Pérez, and C. Juárez Landín, Trans., “Optimizing resource redistribution in delayed projects using genetic algorithms”, RILCO, vol. 6, no. 59, pp. 39–53, Oct. 2024, doi: 10.51896/rilcods.v6i59.654.